共 50 条
- [1] BENEFITS OF PLANNED RE-EQUIPMENT [J]. MACHINERY AND PRODUCTION ENGINEERING, 1973, 122 (3146): : 310 - 315
- [3] EFFECT OF RE-EQUIPMENT ON PRODUCT QUALITY [J]. TEXTILE INSTITUTE AND INDUSTRY, 1968, 6 (04): : 89 - &
- [4] INFLUENCE OF CAPITAL EQUIPMENT AND RE-EQUIPMENT ON PROFITABILITY AND COST [J]. JOURNAL OF THE INSTITUTE OF METALS, 1966, 94 (10): : 349 - &
- [6] A CONTRIBUTION TO RE-EQUIPMENT AND RATIONALIZATION PROBLEMS IN THE ANIMAL BREEDING [J]. AGRARTECHNIK, 1980, 30 (12): : 557 - 558
- [7] PLANNING OF TECHNICAL RE-EQUIPMENT OF CHEMICAL-INDUSTRY [J]. KHIMICHESKAYA PROMYSHLENNOST, 1977, (04): : 304 - 309
- [8] MECHANICAL ENGINEERING INDUSTRY AND RE-EQUIPMENT OF NATIONAL ECONOMY [J]. RUSSIAN ENGINEERING JOURNAL-USSR, 1967, 47 (12): : 3 - +
- [9] MACHINERY FOR RE-EQUIPMENT OF CATTLE-BREEDING PLANTS [J]. AGRARTECHNIK, 1981, 31 (02): : 61 - 64
- [10] Fuzzy evaluation of the technical re-equipment project efficiency [J]. INTERNATIONAL WORKSHOP ADVANCED TECHNOLOGIES IN MATERIAL SCIENCE, MECHANICAL AND AUTOMATION ENGINEERING - MIP: ENGINEERING - 2019, 2019, 537