EXTENSION AND INITIAL OPERATING RESULTS OF THE LD STEEL PLANT NO-3 OF VOEST-ALPINE-STAHL-LINZ

被引:0
|
作者
PRIMAS, K
机构
来源
STAHL UND EISEN | 1992年 / 112卷 / 05期
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Description of the layout and capacity of the LD steel plant No. 3. First operating results: percentage of off-heats of the total production in 1991, life and costs of the converter refractory lining, costs and life of the refractory lining of teeming ladles, casting yield, development of the percentage of continuously cast slabs with transverse and edge cracks of the total production, scarfing losses. Transfer of the production of critical steel grades form LD steel plant No. 2 to LD steel plant No. 3.
引用
收藏
页码:89 / 94
页数:6
相关论文
共 9 条
  • [1] Monolithic refractories in the steel plant of VOEST-ALPINE Stahl Linz
    Reisinger, P
    Presslinger, H
    Mayrhofer, H
    Fischer, N
    UNIFIED INTERNATIONAL TECHNICAL CONFERENCE ON REFRACTORIES (UNITECR 97), VOL 1 - 3: 5TH BIENNIAL WORLDWIDE CONGRESS - REFRACTORIES, A WORLDWIDE TECHNOLOGY, 1997, : 255 - 264
  • [2] RECONSTRUCTION OF VOEST-ALPINE-LD STEEL PLANT-3 AT LINZ
    WIESINGER, H
    WIMMER, H
    KINCEL, G
    NIEDER, W
    IRONMAKING & STEELMAKING, 1989, 16 (02) : 75 - 78
  • [3] MODERNIZATION OF THE LD STEEL PLANT-3 OF VOEST-ALPINE-STAHL-AG, LINZ WITH INCLUSION OF AN EXPERT SYSTEM
    EYSN, M
    STAHL UND EISEN, 1990, 110 (08): : 101 - 103
  • [4] MODERNIZING THE AUTOMATION SYSTEMS IN THE HOT WIDE STRIP MILL AT VOEST-ALPINE-STAHL-LINZ
    ORTMANN, B
    STAHL UND EISEN, 1995, 115 (02): : 35 - 40
  • [5] Integrated, compact LD steel mill at Voest-Alpine Stahl Donawitz
    Schöllnhammer, H
    Wolf, G
    Erker, M
    Herrmann, H
    Gaugl, S
    STAHL UND EISEN, 1999, 119 (02): : 47 - 50
  • [6] Integrated compact LD steelmaking plant at Voest-Alpine Stahl Donawitz
    Schollnhammer, Heinz
    Wolf, Gerfried
    Erker, Mario
    Herrmann, Herbert
    Gaugl, Siegfried
    MPT Metallurgical Plant and Technology International, 1999, 23 (02):
  • [7] Productivity and quality enhancements at the BOF-steel plant of Voest-Alpine Linz
    Voest-Alphine Shahl, Linz, Austria
    Steel Times, 9 (356, 358, 362):
  • [8] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results
    Rasim, Wolfgang A.
    Kessler, Roland
    Seiffert, Gunter
    Garten, Lutz
    Becker, Jens-Ulrik
    Stahl und Eisen, 1997, 117 (05): : 45 - 52
  • [9] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results.
    Rasim, WA
    Kessler, R
    Seiffert, G
    Garten, L
    Becker, JU
    STAHL UND EISEN, 1997, 117 (05): : 45 - +