共 50 条
- [1] EXPERIENCE GAINED IN OPERATION OF 1300-MW SATURATED STEAM-TURBINES [J]. KERNENERGIE, 1985, 28 (02): : 84 - 89
- [5] DEVELOPMENT OF 900 MW COAL-FIRED GENERATING UNITS. [J]. Power Engineering Journal, 1988, 2 (03): : 147 - 154
- [6] DEVELOPMENT AND APPLICATION OF SELF-OPTIMISING CONTROL TO COAL-FIRED STEAM-GENERATING PLANT [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1968, 115 (02): : 307 - +
- [8] DISCUSSION ON DEVELOPMENT AND APPLICATION OF SELF-OPTIMISING CONTROL TO COAL-FIRED STEAM-GENERATING PLANT [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1969, 116 (07): : 1272 - &
- [10] RECOMMENDED PROCUREMENT GUIDELINES FOR PULVERIZERS IN LARGE STEAM-GENERATING UNITS. [J]. Electric Power Research Institute, Coal Combustion Systems Division, (Report) EPRI CS, 1981,