共 50 条
- [2] Training Preservice General Educators to Collect Accurate Antecedent-Behavior-Consequence Data Education and Treatment of Children, 2022, 45 : 173 - 191
- [5] DESIGNING ACCESS SHAFTS FOR TUNNEL CONSTRUCTION. Engineering journal Toronto, 1980, 63 (05): : 12 - 15
- [7] Construction Technique of Vertical Shafts Excavation Above Subway Tunnel Geotechnical and Geological Engineering, 2021, 39 : 4225 - 4235
- [9] Application of constitutive model in simulation analysis of tunnel construction JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2021, 24 (05): : 791 - 797
- [10] Gotthard Base Tunnel in Sedrun - Experience with the construction and operation of two shafts Höfle, H. (hartmuth.hoefle@alptransit.ch), 1600, Ernst und Sohn (06):