首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
HYPERCUBE ALGORITHMS FOR THE MULTIPROCESSOR SCHEDULING PROBLEM
被引:0
|
作者
:
COHEN, E
论文数:
0
引用数:
0
h-index:
0
COHEN, E
MILLER, R
论文数:
0
引用数:
0
h-index:
0
MILLER, R
机构
:
来源
:
SUPERCOMPUTER
|
1988年
/ 5卷
/ 05期
关键词
:
D O I
:
暂无
中图分类号
:
TP3 [计算技术、计算机技术];
学科分类号
:
0812 ;
摘要
:
引用
收藏
页码:17 / 32
页数:16
相关论文
共 50 条
[1]
Approximation algorithms for multiprocessor scheduling problem
Fujita, S
论文数:
0
引用数:
0
h-index:
0
机构:
Hiroshima Univ, Fac Engn, Higashihiroshima 7398527, Japan
Hiroshima Univ, Fac Engn, Higashihiroshima 7398527, Japan
Fujita, S
Yamashita, M
论文数:
0
引用数:
0
h-index:
0
机构:
Hiroshima Univ, Fac Engn, Higashihiroshima 7398527, Japan
Yamashita, M
[J].
IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS,
2000,
E83D
(03)
: 503
-
509
[2]
Approximation algorithms for multiprocessor scheduling problem
[J].
Fujita, Satoshi,
2000,
IEICE of Japan, Tokyo, Japan
(E83-D)
[3]
MULTIGRID ALGORITHMS ON THE HYPERCUBE MULTIPROCESSOR
CHAN, TF
论文数:
0
引用数:
0
h-index:
0
CHAN, TF
SAAD, Y
论文数:
0
引用数:
0
h-index:
0
SAAD, Y
[J].
IEEE TRANSACTIONS ON COMPUTERS,
1986,
35
(11)
: 969
-
977
[4]
Some algorithms of solving minimax multiprocessor scheduling problem
Furugyan, M. G.
论文数:
0
引用数:
0
h-index:
0
机构:
Russian Acad Sci, Dorodnicyn Comp Ctr, Moscow 119991, Russia
Russian Acad Sci, Dorodnicyn Comp Ctr, Moscow 119991, Russia
Furugyan, M. G.
[J].
JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL,
2014,
53
(02)
: 195
-
200
[5]
Approximation algorithms for the multiprocessor open shop scheduling problem
Schuurman, P
论文数:
0
引用数:
0
h-index:
0
机构:
Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
Schuurman, P
Woeginger, GJ
论文数:
0
引用数:
0
h-index:
0
机构:
Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
Woeginger, GJ
[J].
OPERATIONS RESEARCH LETTERS,
1999,
24
(04)
: 157
-
163
[6]
Some algorithms of solving minimax multiprocessor scheduling problem
M. G. Furugyan
论文数:
0
引用数:
0
h-index:
0
机构:
Russian Academy of Sciences,Dorodnicyn Computing Center
M. G. Furugyan
[J].
Journal of Computer and Systems Sciences International,
2014,
53
: 195
-
200
[7]
Local search algorithms for the multiprocessor flow shop scheduling problem
Negenman, EG
论文数:
0
引用数:
0
h-index:
0
机构:
Eindhoven Univ Technol, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
Eindhoven Univ Technol, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
Negenman, EG
[J].
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH,
2001,
128
(01)
: 147
-
158
[8]
On parallelizing the multiprocessor scheduling problem
Ahmad, I
论文数:
0
引用数:
0
h-index:
0
机构:
Hong Kong Univ Sci & Technol, Dept Comp Sci, Hong Kong, Peoples R China
Hong Kong Univ Sci & Technol, Dept Comp Sci, Hong Kong, Peoples R China
Ahmad, I
Kwok, YK
论文数:
0
引用数:
0
h-index:
0
机构:
Hong Kong Univ Sci & Technol, Dept Comp Sci, Hong Kong, Peoples R China
Kwok, YK
[J].
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS,
1999,
10
(04)
: 414
-
432
[9]
MULTIPROCESSOR ALGORITHMS FOR RELATIONAL-DATABASE OPERATORS ON HYPERCUBE SYSTEMS
FRIEDER, O
论文数:
0
引用数:
0
h-index:
0
机构:
AT&T BELL LABS,APPL RES AREA,MURRAY HILL,NJ 07974
AT&T BELL LABS,APPL RES AREA,MURRAY HILL,NJ 07974
FRIEDER, O
[J].
COMPUTER,
1990,
23
(11)
: 13
-
28
[10]
PARALLEL ALGORITHMS FOR GEOMETRIC CONNECTED COMPONENT LABELING ON A HYPERCUBE MULTIPROCESSOR
BELKHALE, KP
论文数:
0
引用数:
0
h-index:
0
机构:
IBM East Fishkill Facility, Hopwell Junction, NY
BELKHALE, KP
BANERJEE, P
论文数:
0
引用数:
0
h-index:
0
机构:
IBM East Fishkill Facility, Hopwell Junction, NY
BANERJEE, P
[J].
IEEE TRANSACTIONS ON COMPUTERS,
1992,
41
(06)
: 699
-
709
←
1
2
3
4
5
→