HEURISTIC METHODS FOR FLEXIBLE FLOW LINE SCHEDULING

被引:65
|
作者
KOCHHAR, S
MORRIS, RJT
机构
关键词
D O I
10.1016/0278-6125(87)90006-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:299 / 314
页数:16
相关论文
共 50 条
  • [1] A taxonomy of flexible flow line scheduling procedures
    Quadt, Daniel
    Kuhn, Heinrich
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (03) : 686 - 698
  • [2] Controlled Wafer Release in Clustered Photolithography Tools: Flexible Flow Line Job Release Scheduling and an LMOLP Heuristic
    Park, Kyungsu
    Morrison, James R.
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (02) : 642 - 655
  • [3] A hybrid meta-heuristic for the flexible flow shop scheduling with blocking
    Wang, Yan
    Jia, Zhao-hong
    Zhang, Xing-yi
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2022, 75
  • [4] THE LOCAL SEARCH APPROACH TO FLEXIBLE FLOW LINE SCHEDULING
    KOCHHAR, S
    MORRIS, RJT
    WONG, WS
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1988, 14 (01): : 25 - 37
  • [5] A heuristic gupta-based flexible flow-shop scheduling algorithm
    Hong, TP
    Wang, CL
    Wang, SL
    [J]. SMC 2000 CONFERENCE PROCEEDINGS: 2000 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOL 1-5, 2000, : 319 - 322
  • [6] Combined column generation and constructive heuristic for a proportionate flexible flow shop scheduling
    Yueh-Min Huang
    Der-Fang Shiau
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 38 : 691 - 704
  • [7] Combined column generation and constructive heuristic for a proportionate flexible flow shop scheduling
    Huang, Yueh-Min
    Shiau, Der-Fang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (7-8): : 691 - 704
  • [8] A heuristic method for a flexible flow line with unrelated parallel machines problem
    Chen, Chun-Lung
    Chen, Chuen-Lung
    [J]. 2006 IEEE CONFERENCE ON ROBOTICS, AUTOMATION AND MECHATRONICS, VOLS 1 AND 2, 2006, : 393 - +
  • [9] HEURISTIC METHODS OF PRODUCTION SCHEDULING
    BERA, H
    ATHERTON, MA
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING, 1988, : 205 - 209
  • [10] A tabu search based heuristic for a flexible flow line with minimum flow time criterion
    Chen, CL
    Usher, JM
    Palanimuthu, N
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-APPLICATIONS AND PRACTICE, 1998, 5 (02): : 157 - 168