共 50 条
- [1] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79
- [2] Optimization of initial cable forces in prestressed concrete cable-stayed bridges [J]. Tongji Daxue Xuebao, 2 (120-124):
- [3] Optimum design of concrete cable-stayed bridges with prestressed decks [J]. INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2016, 17 (5-6): : 339 - 349
- [4] Technologies on Replacement of Structural Members in Prestressed Concrete Cable-stayed Bridges [J]. TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1158 - 1166
- [5] CABLE STAYED BRIDGES WITH PRESTRESSED CONCRETE [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1987, 32 (05): : 52 - 80
- [6] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028
- [8] Construction stage analysis on replacement of closure segment in prestressed concrete cable-stayed bridges [J]. Li, H.-J. (hj.li@rioh.cn), 2012, China National Publications Import and Export (Group) Corporation (34):
- [9] Optimum design of concrete cable-stayed bridges [J]. ENGINEERING OPTIMIZATION, 2016, 48 (05) : 772 - 791
- [10] Dynamic response of concrete cable-stayed bridges [J]. STRUCTURAL DYNAMICS, VOLS 1 AND 2, 1999, : 741 - 746