共 50 条
- [1] WATER DURING OPERATION - IN OTHER TYPES OF TUNNELS [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 41 - 45
- [2] CALCULATION OF THE AMOUNT OF AIR REQUIRED FOR THE VENTILATION OF RAILWAY TUNNELS DURING THEIR OPERATION [J]. JOURNAL OF MINING INSTITUTE, 2007, 172 : 190 - 191
- [3] Review on inspection technology of railway operation tunnels [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2020, 20 (05): : 41 - 57
- [4] Increasing the capacity in long railway tunnels through combination of railway operation control and tunnel control [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 3154 - 3156
- [5] GROUND-WATER AND ITS TREATMENT IN RAILWAY TUNNELS [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 657 - 662
- [6] CLASSIFICATION OF THE STATE OF DETERIORATION OF RAILWAY TUNNELS - THE WATER PARAMETER [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 693 - 698
- [7] MDR – Effective, flexible and operation-oriented flushing system for railway tunnels [J]. Geomechanik und Tunnelbau, 2022, 15 (04): : 414 - 423
- [8] WATER INFLOW PHENOMENA DURING CONSTRUCTION OF RAILWAY TUNNELS ON THE RAMDANE-DJAMEL - JIJEL LINE IN ALGERIA [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 525 - 527