Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem

被引:12
|
作者
Zhang, Lieping [1 ,2 ]
Luo, Yingxiong [3 ]
Zhang, Yu [1 ,2 ]
机构
[1] Guilin Univ Technol, Guangxi Key Lab New Energy & Bldg Energy Saving, Guilin 541004, Peoples R China
[2] Guilin Univ Technol, Coll Mech & Control Engn, Guilin 541004, Peoples R China
[3] Guilin Univ Technol, Coll Informat Sci & Engn, Guilin 541004, Peoples R China
关键词
D O I
10.1155/2015/923791
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to find a feasible solution for the multimode resource-constrained project scheduling problem (MRCPSP), a hybrid of particle swarm optimization (PSO) and differential evolution (DE) algorithm is proposed in this paper. The proposed algorithm uses a two-level coding structure. The upper-level structure is coded for scheduling sequence, which is optimized by PSO algorithm. The lower-level structure is coded for project execution mode, and DE algorithm is used to solve the optimal scheduling model. The effectiveness and advantages of the proposed algorithm are illustrated by using the test function of project scheduling problem library (PSPLIB) and comparing with other scheduling methods. The results show that the proposed algorithm can well solve MRCPSP.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [2] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Lianghong Wu1
    2.College of Electrical and Information Engineering
    JournalofSystemsEngineeringandElectronics, 2010, 21 (05) : 798 - 805
  • [3] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Wu, Lianghong
    Wang, Yaonan
    Zhou, Shaowu
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2010, 21 (05) : 798 - 805
  • [4] An Effective Hybrid Algorithm Based on Particle Swarm Optimization with Migration Method for Solving the Multiskill Resource-Constrained Project Scheduling Problem
    Quoc, Huu Dang
    The, Loc Nguyen
    Doan, Cuong Nguyen
    APPLIED COMPUTATIONAL INTELLIGENCE AND SOFT COMPUTING, 2022, 2022
  • [5] A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2451 - 2460
  • [6] Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Olech, Lukasz P.
    Laszczyk, Maciej
    Skowronski, Marek E.
    APPLIED SOFT COMPUTING, 2018, 62 : 1 - 14
  • [7] A Hybrid Algorithm Based on Simplex Search and Differential Evolution for Resource-Constrained Project Scheduling Problem
    Wang, Ling
    Xu, Ye
    Fang, Chen
    ADVANCED INTELLIGENT COMPUTING, 2011, 6838 : 568 - 575
  • [8] Hybrid differential evolution particle swarm optimization (DEA-DCWPSO) for resource-constrained multi-project scheduling problem
    Wang, Haixin
    Chen, Xin
    Wei, Shengsong
    Wang, Yanjie
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2022, 22 (03) : 957 - 969
  • [9] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [10] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,