PROGRESS REPORT ON REACTOR VESSEL TESTING, INSPECTION

被引:0
|
作者
不详
机构
来源
EEI BULLETIN | 1970年 / 38卷 / 05期
关键词
D O I
暂无
中图分类号
O7 [晶体学];
学科分类号
0702 ; 070205 ; 0703 ; 080501 ;
摘要
引用
收藏
页码:135 / &
相关论文
共 50 条
  • [1] EEI RESEARCH PROJECT ON REACTOR VESSEL TESTING AND INSPECTION
    不详
    EEI BULLETIN, 1972, 40 (02): : 80 - &
  • [2] RESEARCH PROJECT ON REACTOR VESSEL TESTING AND INSPECTION NEARS COMPLETION
    不详
    EEI BULLETIN-EDISON ELECTRICAL INSTITUTE, 1973, (MAR-A): : 76 - 79
  • [3] PREPARATIONS FOR REACTOR VESSEL INSPECTION
    SHANGARI, S
    MEDULAN, K
    PARK, G
    MATERIALS EVALUATION, 1991, 49 (10) : 1290 - &
  • [4] Innovative Reactor Vessel Nozzle Inspection
    Roberts, Thomas
    Walters, Richard H.
    NUCLEAR PLANT JOURNAL, 2010, 28 (02) : 38 - +
  • [5] The use of very modern robotic and testing technology for reducing reactor vessel inspection times
    Heinrich, D
    Müller, G
    Otte, HJ
    ANNUAL MEETING 1998 - NONDESTRUCTIVE MATERIALS TESTING: NONDESTRUCTIVE TESTING OF WELD JOINTS 70 YEARS LATER, 1997, 63 (1-2): : 17 - 28
  • [6] Control System for Reactor Vessel Inspection Manipulator
    Mutka, Alan
    Draganjac, Ivica
    Kovacic, Zdenko
    Postruzin, Zeljko
    Munk, Ranko
    2009 IEEE CONTROL APPLICATIONS CCA & INTELLIGENT CONTROL (ISIC), VOLS 1-3, 2009, : 1312 - +
  • [7] PRE-LAYUP INSPECTION OF EBWR REACTOR VESSEL
    SUTTON, CR
    BALAI, N
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1968, 11 (02): : 648 - &
  • [8] Ultrasonic and eddy current inspection of a reactor vessel drain line
    Attaar, M
    Davis, JB
    NDE IN THE NUCLEAR AND PRESSURE VESSEL INDUSTRIES, 1997, : 707 - 711
  • [9] QUALITY AND EFFICIENCY IMPROVEMENTS FOR REACTOR VESSEL IN-SERVICE INSPECTION
    WARREN, DH
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 41 : 637 - 638
  • [10] Evolution of a new reactor vessel inspection system called SUPREEM
    Attaar, M
    Davis, JB
    NDE IN THE NUCLEAR AND PRESSURE VESSEL INDUSTRIES, 1997, : 713 - 721