A granularity approach to compound real option in multi-stage capital investment project

被引:1
|
作者
Li, Cong [1 ]
Watada, Junzo [1 ]
Zhang, Huiming [1 ]
机构
[1] Waseda Univ, Grad Sch Informat Prod & Syst, Kitakyushu, Fukuoka, Japan
来源
关键词
Compound real option; capital investment; granularity; fuzzy variable; credibility; uncertainty;
D O I
10.3233/IDT-140228
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Capital investment plays a pivotal role in making a company win in a market. In the real world, capital investment is a gradual behaviour, which means that a capital investment project can be divided into multiple stages that can effectively reduce the risks of the investment project. Because the future movement of the market is influenced by various uncertain factors, companies cope with such uncertainties in an effective and timely manner via decision-making using continuously developing and robust tools. The objective of this research is to propose a method that satisfies the requirements of companies. Real option analysis is a relatively new and insightful way to evaluate corporate investment decisions. When undertaking new investments, firms may have options to invest in stages. Moreover, decision-makers often face the situation of having incomplete information. To handle this situation and address problems under uncertain circumstances in the research, a granularity approach is introduced that includes fuzzy variables and credibility theory. In the granularity approach, uncertainty such as fuzzy numbers is taken as a granule, which enables us to take fuzzy numbers not only for uncertain values but also for decision values in a group.
引用
收藏
页码:331 / 341
页数:11
相关论文
共 50 条
  • [1] Application of Compound Option Theory for Evaluating Multi-Stage Investment Project
    Chen Huili
    [J]. PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1405 - 1408
  • [2] Multi-stage compound real options valuation in residential PV-Battery investment
    Ma, Yiju
    Swandi, Kevin
    Chapman, Archie C.
    Verbic, Gregor
    [J]. ENERGY, 2020, 191
  • [3] A fuzzy real option approach for investment project valuation
    Ho, Shiu-Hwei
    Liao, Shu-Hsien
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (12) : 15296 - 15302
  • [4] Portfolio optimization for multi-stage capital investment with neural networks
    Zhang, YL
    Hua, Y
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2004, PT 2, 2004, 3174 : 982 - 987
  • [5] A real option approach for valuating a venture capital project
    Dong, YH
    Ren, GY
    Xia, J
    [J]. PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 1648 - 1652
  • [6] Compound deferrable options for the valuation of multi-stage infrastructure investment projects
    Huang, Yu-Lin
    Lin, Tsen-Chin
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2023, 41 (08) : 670 - 686
  • [7] Valuation of multi-stage BOT projects involving dedicated asset investments: a sequential compound option approach
    Huang, Yu-Lin
    Pi, Chai-Chi
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (07) : 653 - 666
  • [8] Pricing convertible bonds based on a multi-stage compound-option model
    Gong, Pu
    He, Zhiwei
    Zhu, Song-Ping
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2006, 366 (01) : 449 - 462
  • [9] OPTION APPROACH TO CAPITAL INVESTMENT EVALUATION
    Rovcanin, Adnan
    [J]. EKONOMSKI PREGLED, 2005, 56 (7-8): : 544 - 554
  • [10] Introduction of multi-stage evaluation in IT research and development project on real options
    Liu Xiaoying
    Fang Weigguo
    [J]. PROCEEDINGS OF THE 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, FINANCE ANALYSIS SECTION, 2007, : 1097 - 1103