共 50 条
- [1] NEW EXCHEQUER DAM, CALIFORNIA - CLOSURE JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1987, 113 (10): : 1139 - 1143
- [2] Seismic stability of new exchequer dam and gated spillway structure DAM O&M ISSUES - THE CHALLENGE OF THE 21ST CENTURY, 2000, : 437 - 458
- [3] DOUGLAS DAM - DISCUSSION TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1948, 113 : 120 - 138
- [4] A PLAN FOR A MOVABLE DAM - DISCUSSION TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1946, 111 : 262 - 274
- [5] THE XINGO ROCKFILL DAM - DISCUSSION JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1987, 113 (10): : 1276 - 1278
- [6] MASINGA DAM IN KENYA - DISCUSSION PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (DEC): : 1471 - 1475
- [9] The failure of Carsington Dam - Investigation of the failure of Carsington Dam - Discussion GEOTECHNIQUE, 1995, 45 (04): : 719 - 739
- [10] FIXED-CONE VALVE PROTOTYPE TESTS NEW MELONES DAM, CALIFORNIA. Technical Report - US Army Engineer Waterways Experiment Station, 1983,